PE Drawings

PROCESS · PRICING · TURNAROUND

How To Get PE Stamped Plans For Your Building Permit

A plain-English walkthrough of what happens between “my inspector wants engineered drawings” and a sealed PDF uploaded to the permit portal.

PROJECTPE DRAWINGS
STEP 1Send your scope
STEP 2Fixed quote
STEP 3Design & draft
STEP 4Seal & deliver
LICENSED
PROFESSIONAL
ENGINEER
SEAL
Prefer to just talk it through?
Live chat is the fastest way to find out what your permit needs. No forms, no sales pitch.
THE PROCESS IN DETAIL

Four steps, and what each one actually involves

STEP 01 · YOU

Send the scope and whatever you have

Project address, a description of the work, and any of the following: phone photos, a hand sketch, an old set of plans, a survey, a contractor’s proposal, or the plan-review comment letter your city sent you. The comment letter is the single most useful document you can send — it tells us exactly what the reviewer wants.

STEP 02 · US

Fixed quote and sheet list

Within hours you receive a firm price, a committed delivery date, and a list of the sheets and calculations we will produce. If your jurisdiction has an unusual requirement — a surveyor’s seal, a threshold inspection, an architect of record — we flag it now, not later.

STEP 03 · US

Engineering, drafting and your review

We run the load calculations, size the members or equipment, and draft the sheets to your adopted code edition. You receive a draft PDF for review. Dimensions, product selections and details get confirmed here, while changes are still easy.

STEP 04 · PE

Signed, sealed and delivered

A Professional Engineer licensed in your state signs, seals and dates every sheet, plus the calculation package. You get print-ready PDFs sized for direct upload to the permit portal or for printing at a plan room.

AFTER SUBMITTAL

Plan-review comments are part of the job, not an extra invoice

Almost every permit set gets at least one comment. What matters is how fast it gets resolved and who pays for it.

You forward the comments

Email or live chat — a screenshot of the portal is fine.

We respond in writing

A point-by-point response letter referencing the code sections the reviewer cited, plus revised sheets where needed.

Re-issued at no charge

Comments on our scope are corrected and re-sealed free. Scope changes you request are quoted as a revision.

PRICING & TURNAROUND

What PE stamped plans typically cost and how long they take

Pricing is by scope, agreed before work starts. The ranges below are typical for residential work; complex, commercial and high-wind or high-seismic projects are quoted individually.

DeliverableWhat it includesTypical turnaround
PE engineering letterSingle sealed letter for one condition — beam, footing, roof load, damageSame day to 2 days
Single structural sheet + calcsOne S-sheet with schedule and details, sealed calculations1–3 days
Deck or accessory structure setFraming, footings, connections, sealed calculations2–3 days
Site / plot planBoundary, setbacks, structures, zoning data2–4 days
Solar PV permit setStructural letter, array layout, single line, attachment detail1–3 days
Full residential permit setArchitectural + structural + MEP, coordinated and sealed5–10 days
Commercial TI / change of useArchitectural, MEP, egress, structural as required7–15 days

Rush service compresses most of these substantially. Ask in chat before you order — if we cannot hit your date we will say so.

Questions before you order?
Live chat connects you straight to an engineer who can confirm the sheets, the code sections and the price for your job.
FAQ

Frequently asked questions

What information do you need to give me a price?

The project address, a short description of the work, and photos or a sketch. For structural work, the span and what the member carries. For MEP, the equipment involved. That is usually enough for a firm quote.

When do I pay?

After you accept the quote and before the sealed set is released. Larger commercial projects are commonly split into a deposit and a balance at delivery.

What file format do I receive?

Signed and sealed PDFs at full sheet size, ready to upload to the permit portal or print. CAD files can be provided on request.

Can you meet a same-week deadline?

Often yes. Tell us the date up front — we would rather decline a job than miss a permit deadline you are relying on.

FREE QUOTE · NO OBLIGATION

Request your free fixed quote

Send the address and the scope. You get a fixed price, a delivery date and the exact sheet list your building department expects — usually the same business day.

Quote request form

Attach photos, a sketch or your plan-review comments — whatever you have is enough to start.


Or skip the form entirely

Live chat reaches an engineer directly, and you can send images straight into the chat window. It is the fastest way to find out what your permit needs.

NEXT STEP

Ready to get your plans stamped?

Send us your address, photos or a rough sketch. We’ll come back with a fixed price, a turnaround date and the exact sheet list your building department expects.

Scroll to Top